Paver base calculator for Minnesota
The layer below the pavers keeps a patio level over time, calculated by tons at its compacted depth.
Enter your project dimensions
The stone layer below pavers costs much less per square foot than the finished surface, yet it is usually the layer behind a failed patio. Reports of paver repairs commonly trace back to what is underneath. Use this calculator to size compacted crusher run or a comparable mix at 1.5 tons per cubic yard: 4 inches for walking areas and 6-8 for vehicle areas. The +10% compaction allowance is selected by default. Calculate bedding sand separately as its required 1-inch course.
Base sizing
- Start with the paved dimensions in feet, then extend the base 6 inches beyond each unclosed paver edge. That extra base supports the edge restraint.
- Use 4 inches of compacted material for patios and walkways. Allow 6 beneath driveways or on clay soil, and 8 beneath driveways where the ground is soft.
- To find yards, divide cubic feet by 27; multiply that result by 1.5 for tons. The +10% allowance is on.
Excavation depth = base + 1" bedding + paver thickness − reveal
Project depth and coverage
| Project | Compacted base depth | 1 ton covers |
|---|---|---|
| Walkway or garden path | 4 inches | ≈ 54 sq ft |
| Patio or seating area | 4-6 inches | ≈ 43 sq ft |
| Driveway with cars | 6-8 inches | ≈ 31 sq ft |
| Clay or soft subgrade | add 2 inches + fabric | n/a |
Excavation layers from lawn to finished paver
Plan excavation by adding each layer together. For a standard patio, that means 4 inches of base, 1 inch of bedding sand, and a 2 3/8 inch paver brought flush to the lawn. The excavation is 7.5-inch, subject to the reveal desired above grade. Put the target depth on a stake and verify it during digging. Digging too far has two costs: soil must be removed, and more stone is needed to restore the depth. The Dirt Calculator run in reverse shows how many yards come out of the excavation.
Paver base installation notes
- Build the base in 2-inch layers, running a plate compactor over each layer after a light mist. Material compacts more densely when damp than when dry.
- Shape the finished base so it drops 2-3% away from the house. Its grade will carry through the sand and the pavers.
- Use the 6-inch overhang to support the edge restraint on compacted base rather than on lawn soil.
- For clay ground, place a woven geotextile fabric below the base. It keeps aggregate from being pushed down into wet subgrade over successive seasons.
- Base thickness cannot be replaced with an overly deep sand setting bed. Sand shifts, which is a common source of uneven patio surfaces.
Re-laying old pavers: checking the base
Rebuilding an existing patio can leave the underlying base in place. Remove the pavers, rake away the used bedding sand, then assess the base. If it remains level, firm, and drained, add a fresh bedding course 1-inch deep, reducing the stone needed to a tenth of a full new installation. Remove the base as well where there are low areas, soft sections, or pooled water. Otherwise, the same problem can return beneath the replacement pavers.
Example: a 16 x 12 patio
Schedule the delivery after excavation, since a stone pile left on the lawn for two weeks can leave a dead rectangular area. For 192 square feet of paving, the 6-inch overhang along three open sides makes the base footprint 210. Using 4 inches of compaction: 210 x 0.333 = 70 cubic feet = 2.6 cubic yards, about 3.9 tons, or 4.3 with the allowance. Order 4.5 tons of crusher run and 0.9 tons of bedding sand from the Paver Sand Calculator in one free delivery.
Questions on base depth, excavation and tonnage
How much paver base do I need?
Will 2 inches of paver base work?
What depth should paver base be?
How far down should I dig for pavers?
Paver base: crusher run or screenings?
Can pavers be installed without a base?
Other calculators
Paver base notes
Order crusher run and screenings by the ton with bedding sand, including free delivery.